Progress so far
We have made strides since the last update which includes the metal deck and concrete to the upper floors, the drainage below the ground floor slab and the concrete to the ground floor slab.
The steel frame system has also progressed very well and this week we have started the decking to the roofs. We have completed all of the external drainage and began top soiling in some localised areas.
The external scaffolding is coming along very well.