Visit our parent site www.sewell-construction.co.uk
450
cubic metres of concrete poured to all floors
4
picnic benches for creation of wellbeing area for site operatives
12
various bird boxes built out of recycled wood from the site and fixed in the nature zone

Progress so far

We have made strides since the last update which includes the metal deck and concrete to the upper floors, the drainage below the ground floor slab and the concrete to the ground floor slab.

The steel frame system has also progressed very well and this week we have started the decking to the roofs. We have completed all of the external drainage and began top soiling in some localised areas.

The external scaffolding is coming along very well.

Over the next two weeks

Over the next two weeks we will be continuing with roof decking and roof coverings.

The steel frame system will be nearing completion and we will also commence fixing the external weatherboard.

The external scaffold will also continue and we will be completing the blockwork to the lift shaft.

We will be preparing tarmac for the multi use games area and commencing the lightening protection system.